 30  Strings outline bottom of floor joists.  The crew rests.      Roots, rocks, and clay.    2-man gas powered auger was used to start holes but post-hole digger did most of the work.   Rocks and roots made digging tough.  He quit his binky four days later!    The crew perks up for a snack break.  8  9 x 60lb bags of concrete poured.   Bolts will attach beams.  Site perspective.  Beams set.  Shims fine-tune level.